会员中心     
首页 > 资料专栏 > 论文 > 经营论文 > 项目管理论文 > MBA硕士论文_重庆海尔路综合整治项目风险管理研究DOC

MBA硕士论文_重庆海尔路综合整治项目风险管理研究DOC

资料大小:260KB(压缩后)
文档格式:DOC
资料语言:中文版/英文版/日文版
解压密码:m448
更新时间:2017/9/11(发布于云南)

类型:金牌资料
积分:--
推荐:免费申请

   点此下载 ==>> 点击下载文档


文本描述
分 类 号: 密 级:
论文编号: 学 号:51323610108
重庆理工大学硕士学位论文
重庆海尔路综合整治项目
风险管理研究
研 究 生: 何巧巧
指 导 教 师: 孙芳城教授
学 位 类 型: 专业学位
专业学位类别: 工商管理硕士(MBA)
研 究 方 向: 财务管理
培 养 单 位: MBA 教育中心
论文完成时间: 2016 年 3 月 18 日
论文答辩日期: 2016 年 5 月 28 日Category Number: Level of Secrecy:
Serial Number : Student Number:51323610108
Master's Dissertation of Chongqing University of Technology
Study on the Chongqing Haier Road
Comprehensive Improvement Project
Risk Management
Postgraduate: He Qiaoqiao
Supervisor: Sun Fangcheng
Degree Category: Professional Degree
Specialty: MBA
Research Direction: Financial Management
Training Unit: MBA Education Center
Thesis Deadline: Mar. 18, 2016
Oral Defense Date: May. 28, 2016重庆理工大学
学位论文原创性声明
本人郑重声明:所呈交的学位论文是本人在导师的指导下,独立进行研究所
取得的成果。除文中特别加以标注引用的内容外,本论文不包含任何其他个人或
集体已经发表或撰写的成果、作品。对本文的研究做出重要贡献的集体和个人,
均已在文中以明确方式标明

本人承担本声明的法律后果

作者签名: 日期: 年 月 日
学位论文使用授权声明
本学位论文作者完全了解学校有关保留、使用学位论文的规定,同意学校保
留并向国家有关部门或机构送交论文的复印件和电子版,允许论文被查阅和借阅

本人授权重庆理工大学可以将本学位论文的全部或部分内容编入有关数据库进行
检索,可以采用影印、缩印或扫描等复制手段保存和汇编本学位论文

本学位论文属于(请在以下相应方框内打“√”):
1.保密□,在 年解密后适用本授权书

2.不保密□

作者签名: 日期: 年 月 日
导师签名: 日期: 年 月 日I
摘 要
海尔路综合整治项目是重庆市对海尔路进行的一个综合彻底整治工程,建立在
在海尔路大修工程的基础上,目标是实现“清爽、整洁”的形象。本文旨在对该项目
进行风险识别和分析,为重庆海尔路综合整治项目构建项目风险评价体系,并对其
风险进行量化。当 J 建设公司为该项目制定整治风险应对策略时,本文可以提供参

本文的主要内容有:①利用德尔菲法,本文识别出海尔路综合整治项目的风险
包括项目融资风险,项目勘探设计风险,项目成本风险,项目质量风险,项目安全
风险;同时还识别出其细化风险,构建出两层项目风险评价指标;②利用层次分析
法,本文计算出两层风险指标的权重,从而构建了项目风险评价体系;③利用模糊
综合法,本文给出了该项目的综合得分为 74.18 分,评价为 C 级(一般),即项目风
险一般,在接受范围内,需要对项目风险比较大的地方进行局部调整,并相应的调
整局部的项目风险控制制度;④模糊综合法还得出了该项目存在的风险点,其中需
要特别注意的风险有原材料价格上涨、工人工资率上涨、追加工程量;最后,本文
针对这些风险给出了相应的应对策略

本文的研究成果可以提供参照,用于其他类似公路建设项目的风险控制;本文
所构建的项目风险评价体系,可以直接应用于公路建设项目,用于进行项目风险评
估。同时,该研究的理论基础为公路建设风险管理理论及方法,检验了相关理论方
法在项目实践应用中的可行性,促进了项目风险管理理论与实践的融合

关键词:公路工程项目;风险管理;城市公路整治;重庆市海尔路IIIII
Abstract
Based on Haier Road Overhaul engineering, Haier Road comprehensive treatment
project, which treats the Haier Road comprehensively and thoroughly, aims to bring
about a neat and tidy image. And this essay, as a reference for Company J when making
formulate coping-strategies, will discern and assess its risk, develop a risk assessment
system and quantify its risk.
The main content of this article are: ① using the Delphi method, this paper
identified the Haier road comprehensive improvement project including project financing
risk, the risk of project exploration and design risk, risk of project cost, project quality
risks, project safety risk; Also identify the elaboration risk at the same time, build up two
layers of project risk evaluation index; ② using analytic hierarchy process (AHP), this
paper calculates the two layers of indicators of risk weighting, to build the project risk
evaluation system; ③using the fuzzy synthetic method, the paper gives the
comprehensive score of 74.18 points, the evaluation of class C (in general), namely the
project risk, within the scope of the accept, need for project risk bigger place partial
adjustments, and adjust the local project risk control system; ④ fuzzy synthesis also
concluded that the project risks, which need to pay special attention to the risk of rising
raw material prices, wages rate, additional quantities; Finally, against these risks, the
paper puts forward the corresponding countermeasure.
This article research results can provide reference for highway construction projects
is the huge risk control; Builds project risk evaluation system, this paper can be directly
applied to highway construction project, for project risk assessment. At the same time, the
theoretical basis of the research theory and method of risk management for highway
construction, examine the feasibility of the application of related theory in the project
practice, promote the integration of theory and practice of project risk management.
Keywords: Highway engineering projects; Risk management; Urban road renovation;
Chongqing Haier roadIV
目 录
摘 要... I
Abstract ......... III
目 录.IV
1 绪论 . 1
1.1 研究背景及意义.. 1
1.1.1 研究背景..........1
1.1.2 研究目的及意义..........1
1.2 国内外研究现状.. 2
1.2.1 国外研究现状..2
1.2.2 国内研究现状..3
1.3 研究方法.. 5
1.4 研究内容及技术路线...... 5
2 理论基础 ..... 9
2.1 公路工程项目风险.......... 9
2.1.1 公路工程项目风险概念..........9
2.1.2 公路工程项目主要风险..........9
2.2 公路工程项目风险管理理论...... 10
2.2.1 公路工程项目风险管理概念10
2.2.2 公路工程项目风险管理理论的发展10
2.3 公路工程项目风险管理方法.......11
2.3.1 公路工程项目风险识别的方法........11
2.3.2 公路工程项目风险评估的方法........11
2.3.3 公路工程项目风险应对的方法........13
2.4 本章小结 13
3 重庆海尔路综合整治项目的概况与环境分析 .. 15
3.1 项目概况 15
3.1.1 项目建设单位介绍....15 V
3.1.2 项目地理位置与经济价值 ... 16
3.1.3 项目规模与建设内容 ........... 17
3.1.4 项目特点 ....... 18
3.2 重庆市公路建设宏观环境分析18
3.2.1 重庆市公路建设政策 ........... 18
3.2.2 重庆市公路建设产业环境分析 ....... 19
3.2.3 公路质量要求 ........... 19
3.3 本章小结20
4 重庆海尔路综合整治项目风险识别 ...... 21
4.1 项目风险因素分析 ........ 21
4.1.1 项目风险因素的分析思路 ... 21
4.1.2 可能存在的项目风险因素 ... 21
4.2 基于德尔菲法的项目风险识别24
4.2.1 项目风险识别问卷设计 ....... 24
4.2.2 项目风险识别问卷结果分析 ........... 25
4.3 本章小结26
5 重庆海尔路综合整治项目风险评价 ...... 27
5.1 构建风险评价指标体系27
5.1.1 评价体系建立的重要性 ....... 27
5.1.2 评价指标的确定 ....... 27
5.1.3 评价指标权重分析 ... 27
5.2 基于模糊综合法评价项目风险30
5.2.1 模糊评价综合法的具体评价过程 ... 30
5.2.2 模糊综合评价法的评价标准 ........... 31
5.2.3 模糊综合法对项目风险评价的过程与结果 31
5.3 本章小结35
6 重庆海尔路综合整治项目风险应对策略 .......... 37
6.1 项目融资风险的应对 .... 37
6.2 项目勘探设计风险的应对 ........ 37
6.3 项目成本风险的应对 .... 39
6.4 项目质量风险的应对 .... 41
6.5 项目安全风险的应对 .... 42
6.6 本章小结43 VI
7 结论与展望........... 45
7.1 结论........ 45
7.2 展望........ 46
致谢.....47
参考文献.........49
附 录.53
附录 1 项目风险因素识别的专家问卷调查.......... 53
附录 2 指标权重确定的问卷调查.. 55
附录 3 海尔路综合整治项目风险评价问卷.......... 58
个人简历、在学期间发表的学术论文及取得的研究成果59
VII1
1 绪论
1.1 研究背景及意义
1.1.1 研究背景
海尔路综合整治是重庆市在海尔路大修工程的基础上对海尔路进行综合彻底整
治工程,形成“清爽、整洁”的形象。工程主要包括八个方面的内容:一是对全线进
行路基补强后统一进行沥青罩面;二是对全线中央分隔带进行改造;三是全线更换
人行道砖及路缘石;四是全线改造桥梁栏杆及波形护栏;五是增设道路雨水系统,
修复道路内侧沿线重要场镇雨污水管网系统