本文的研究过程始终坚持理论和实践相结合。首先阐述了国内外现有的可行
性研究相关理论,在此基础上分析了双马垃圾场项目在当前环境下的必要性、场
址选择、建设规模等,随后对双马垃圾场环境治理项目进行了整体研究,制定了
投资估算计划和资金筹措方式。最后对双马垃圾场治理项目进行了经济效益和社
会效益评价
关键词:双马垃圾场;垃圾处理;可行性研究ABSTRACT
Garbage disposal is one of the infrastructure of urban construction,which can affect
the economic development and residents’ living environment.Shuangma Landfill in
Xiangtan constructed early,and subsequently,the master plan of city and the regional
planning have changed,state makes greater demands on urban garbage disposal and the
environmental governance of landfill.Shuangma Landfill has problems with
environment :the scope of the demolition where the landfill site and sewage from the
residential areas does not reach 500 meters;the environment of landfill is harm to the
Xiangjiang lake and is incompatible with the Xiangjiang scenery.Therefore,the
environmental governance is very urgent.
This paper aims to combine theory and practice.First,the paper represents the
existing feasibility study at home and abroad,based on the analysis ,analyses the
necessity of the Shuangma Landfill in this case, site selection and construction
scale.Then,the paper conducts a comprehensive study of the Shuangma landfill to draw
up the plan of investment estimation and the financing.Finally,financial evaluation and
social evaluation have been given .
Key Words:Shuangma Landfill;Garbage disposal;feasibility study