本文首先分析了国内外脱硝技术发展的背景,并介绍了脱硝技术在燃煤火电机组
上的实际实施情况以及在役燃煤火电机组脱硝改造情况,火电企业脱硝技术的实际运
行情况,九台电厂现有基础条件。本文对九台电厂脱硝改造技术方案的选择进行了分
析设计,包括对脱硝改造的风险、设备及材料的选择和安装工艺、改造后对现有设备
性能的影响等进行了分析,对九台电厂脱硝改造对环境的影响进行了分析,包括对改
造后可能对周边环境带来的空气污染、噪声污染等的控制和效果,以及改造工程带来
的环境效益。对九台电厂脱硝改造的社会影响进行了分析,包括可能造成的群众纠纷
以及社会效益等分析,对电厂脱硝改造的经济效益进行了分析,包括脱硝改造工程的
成本、运行成本以及日后收益的预估等。在上述分析中,采用了电厂大量的试验数据
以及日常运行数据,并对国内外现有技术进行了研究,对设备及原材料市场进行市场
调查,查阅相关技术规范及标准并结合国家和吉林省有关部门的相关法律、法规、制
度及政策,对项目进行了较为客观全面的分析,通过对九台电厂脱硝改造项目的技术
可行性分析,经济效益分析,环境效益及社会效益分析,可以得出华能九台电厂 2 X
660MW 火电机组脱硝改造项目是可行的。
关键词
脱硝 改造 可行性研究 九台电厂
Abstract
With the development of our national economy,in power production in bring the
pollution of the environment is more and more serious. NOx discharge is now
serious imposed on in accordance with the flue-gas dischargestandard of fossil power plant
published by the state because of its detriment with Nox to the environment.,and in
environmental policy,plan of electricity, electricity market rules, denitration price
compensation to existing coal-fired generator set denitration reconstruction positive support
and policy regulation control Therefore,the applicatim of the denitration technology should
be strongly extended。Huaneng jiutai power plant is planning for active duty 2 X 660MW
coal-fired electric group perform denitration renovation to comfirm with national standard.
This article has first analyzed the domestic and foreign De-NOx technology
development background, and introduces the denitration technology in coal-fired power
plant on the actual implementation of the existing coal-fired power plant denitration
renovation, denitration technology in actual operation, the existing Jiutai power plant
infrastructure, In this paper, the Jiutai power plant denitration technology reform scheme is
analyzed and designed,Including Analysis of the risk of denitration transformation, the
choice of equipment and materials and installation process, after transforming effect the
performance of the existing equipment and so on ,The Jiutai power plant denitration
transformation&39;s impact on the environment is analyzed,Including the denitration may bring
in the surrounding environment such as air pollution, noise pollution, and the environmental
benefits of denitration。the social impact of The Jiutai power plant Denitration is analyzed,
Including may cause disputes and social benefit analysis , The economic benefits of
denitration transformation are analyzed, Including the denitration project cost, operation cost
and future earnings forecasts, etc. In the above analysis, Using the power plan a lot of testing
data and daily operation data and research on the existing technology at home and
abroad,market for equipment and raw materials market investigation, and consult the
relevant technical specifications and standards,, According to the state and jilin province
department of the relevant laws, regulations, system and policy, the more objective and
comprehensive analysis was carried out on the project denitration. Based on the Jiutai power
plant denitration reconstruction project of technical analysis, financial benefit analysis,
environment benefit analysis and social benefit analysis, it can be Huaneng jiutai power
plant 2X660MW thermal power unit denitration renovation project is feasible.
.
Keywords:
Denitration, reconstruction,Feasibility study,Jiutai power plant.