关键词:项目管理;流程改善;项目优化;“门”管理HF 汽车零部件座椅开发项目管理优化研究
I
ABSTRACT
Project management from 1942-1946, the Manhattan project, first used in the second
world war ii, belonging to management science and engineering discipline, between
social science and natural science.With the continuous development of management
science and engineering, project management application gradually expanded, especially
in automobile parts enterprises, more widely used.In terms of domestic auto parts
enterprise development in our country, in project management, there are a lot of
problems, first performance in the low level of project management, compared with
abroad, the gap is bigger.In this study, will focus on HF company, car seat project
management, combined with gate control management theory and model, to study the
possible risk in the project, using the theory and practice fusion, can improve the project
management system, optimize the project management method.Based on this, this article
study, will be the first to focus on analysis of the concept of project management, this
paper expounds the methods and characteristics of project management;Combining HF
(hefei) company actual car seat project, combined with gate control management
approach , analyzed HF company, difficulties in project management, and aiming at
these difficulties, puts forward the Suggestions and strategies.In view of the project
management process, it is rich in contents, this article, based on the actual management
situation of S432 automotive project, to design and optimize the scheme of management,
import the SDT team, realize PLUS process efficiency, and using the theory of gating
to achieve the project management, in view of the current, the project management,
analyzes the existing problems, and based on the transverse, longitudinal and vertical
organizational structure and dimension put forward new project management framework,
for other types of project management in the future put forward the corresponding
Suggestions and strategies.
Key words: Project management; Process improvement; Project optimization; Door
managementHF 汽车零部件座椅开发项目管理优化研究目 录
第一章 绪论.......1
第一节 研究背景...........1
第二节 研究意义...........1
第三节 国内外现有研究成果...2
一、国外研究成果..2
二、国内研究发展..3
第四节 研究的内容和方法.......4
第二章 项目管理基本理论......5
第一节 项目管理概念...5
第二节 项目管理的特点...........6
第三节 项目进度管理...6
一、项目进度管理概述......6
二、项目进度计划的主要方法......7
三、项目进度控制..7
第四节 汽车座椅项目管理.......8
一、汽车座椅项目管理模式..........8
二、汽车座椅项目的特点..8
第三章 HF 公司 S432 项目管理解剖..9
第一节 HF 公司及其项目管理体系.....9
一、HF 公司背景介绍........9
二、HF 公司项目管理体系介绍....9
第二节 S432 项目管理体系....10
一、S432 项目发起阶段...10
二、S432 项目提议阶段...11
三、S432 项目设计开发阶段.......15
四、S432 项目设计验证阶段.......16目 录五、S432 项目生产验证阶段.......16
六、S432 项目投产阶段...17
第三节 项目进度管理及规划.17
一、S432 项目的 PAP 管控..........17
二、S432 项目的 ECO 管控.........19
三、S432 项目的 SDT 小组划分.19
四、S432 项目关键路径的建立...20
五、S432 项目关键时间节点.......22
六、S432 项目的工作分解结构...23
第四节 S432 项目中的项目变更........26
第五节 S432 项目中的计划风险管理28
第四章 S432 汽车座椅项目管理中存在的问题...... 29
第一节 项目更改流程混乱.....29
第二节 忽视了项目管理目标.....