文本描述

Huawei Technologies
Huawei APS Project
Integrated Testing Strategy

Revision 1.0 / 4-September-2002TABLE OF CONTENTS
PURPOSE 3
INTRODUCTION 3
SCOPE 4
Functions/Scenarios 5
ARCHITECTURE 10
Test Environment Requirements 10
Demand Planning to Forecast Netting 10
Forecast Netting to S&OP, Master Planning & Production Planning FP 11
Master Planning SCP to Factory Planning FP 12
Factory Planning FP to Master Planning SCP 13
Master Planning SCP to Allocation Planning / Order Promising DF 14
S&OP SCP to Supplier Collaboration SCC 15
Supplier Collaboration SCC to Master Planning SCP 17
REVISION HISTORY 19
MAJOR CHANGES SINCE LAST REVISION 19
REQUIRED APPROVALS 20
Purpose
This is a communication vehicle for the entire ISC project team including the APS team as well as the ERP team. It should be used by all of those who will be responsible for planning preparation and execution of test components. This document will be further substantiated by the Test Plans, which will define in detail the specific areas of testing for each level and type of test.
Introduction
This document constitutes the Testing Strategy for the APS BR1 implementation. It describes the overall test strategy to be adopted and defines the following:
What is the scope of the modules to be tested
What are the key risks within that scope
What test needs to be performed to address those risks
When should the test be done
Who is responsible for performing the key testing activities
Scope
This section describes the scope of the APS BR1 solution, cover at a high level, the functions included, the application architecture, technical architecture and operational changes.
The diagram below defines the scope of the APS BR1 implementation. It also shows the information flows between the ERP system and i2 APS.